- Energy Meter Field Calibrator
-
Transformer Test Equipment
- Transformer Test Bench
- Turns Ratio Tester
- DC Resistance Tester
- Transformer Tan Delta Tester
- Sweep Frequency Response Analyzer
- Partial Discharge Tester
- CT PT Analyzer
- Transformer On-Load Tap-Changer Tester
- Short-Circuit Impedance And No-load Integrated Tester
- Winding Resistance And Turns Ratio Integrated Tester
- Transformer Capacitance And Inductance Tester
- Transformer Capacity And Characteristic Tester
- Lightning Arrester Tester
- Short-Circuit Impedance Tester
- Transformer Oil Test Equipment
- SF6 Gas Analyzer
- Secondary Injection Relay Test Set
- Resistance Tester
- Power Quality Analyzer
- HV Switch Tester
- High Voltage Test Equipment
- Cable Fault Locator
- Battery Tester
Huazheng Phasing tool HV detector Wireless Digital Non Contact High Voltage Phasing Tester
Product Features
Working Principle
The instrument consists of two transmitters (X and Y) and a receiver. The two transmitters can determine whether the line is charged and launch a phase signal. The receiving meter collects signals from both transmitters to determine whether the phase sequences on both sides are the same.
Security Matters
Technical Characteristics
| The voltage level instructions | Instructions | Added |
|---|---|---|
| 500KV | Launcher insulating rod (5 meters), the hook on the high tension line directly, host boot. | Conventional |
| 330KV | Launcher insulating rod (4 meters), the hook on the high tension line directly, host boot. | Conventional |
| 220KV | Launcher insulating rod (3 m), direct hook on the high tension line, the host boot. | Conventional |
| 110KV | Auncher insulating rod (3 m), direct hook on the high tension line, the host boot | Conventional |
| 35KV | Launcher insulating rod (3 m), direct hook on the high tension line, the host boot. | Conventional |
| 10KV(bare wire) | Launcher insulating rod (3 m), direct hook on the high tension line, the host boot. | Conventional |
| 380V/220V | Use the special test line of mains connection launcher (as shown in figure 1), the host boot. | Use the special test line of mains |
| Switchgear induction electric (~ 5 V) | Use switchgear induction electric test line connection transmitter (see switchgear induction electric measuring point) host boot | Use switchgear induction electric test line. |
The Test Results Analysis
| Phase difference value (f) | The phase difference is stable | Results the judgment | Added |
|---|---|---|---|
| 0~5 | Stable | In phase |
Two lines with the frequency,
Such as voltage.
|
|
115~125
or235~245
|
stable | phase-out |
Two lines with the frequency,
Such as voltage.
|
| 0~360 | Is not stable, 0 ~ 360 degrees cycle changes | Two line frequency is not the same | Not parallel. |
| The value near 0、120、240 | Stable | Two line voltage is not the same. |
Two lines the same frequency, voltage,
Not parallel.
|
Instruments To Check
| Check the project | Check the method | Normal phenomenon | Abnormal phenomenon | Exception handling |
|---|---|---|---|---|
| Insulating rod pressure | Check pressure performance reference appendix A | Leakage current is less than 10 uA | Leakage current is greater than 10 uA | Replace the insulation rod |
| Transmitter power | Unscrew the cap, dial up the transmitter switch to open position. | Buzzer rang 2 seconds, the indicator light flashing in 1 and 2. | The buzzer rang, or example, said the battery is low. |
The transmitter switch, connect a charger.
After full charge indicator for the green light.
|
| The emitter function | Use the special test line of mains connection (see figure 1), the mains. The receiving host boot. | Buzzer rang 2 seconds, the indicator light flashing in 1 and 2. The receiving host display corresponding to the frequency of the transmitter. | In power under normal conditions, the light is not flashing, host according to the corresponding frequency of 0 . | Transmitter failure, returned to the factory maintenance. |
| The host battery | The host boot | The battery capacity is greater than 1 | Shows the battery is too low, the host automatically power off. | After connect charger, full of for the green light . |
| The host wireless communications | Host machine, emitter accept electric work normally. | The host shows the frequency of the corresponding normal information. | Host shows the frequency of the corresponding to zero. | Return to factory maintenance. |
Maintenance
1.When not in use for an extended period, please fully charge the instrument before storage.
2.This product should not be stored in damp, high-temperature, or dusty environments.
3.The insulating rod should undergo a voltage withstand test before each use and annually thereafter.
After-sales Service
1.If quality problems arise within one month of purchase, the company will provide a free replacement.
2.For quality issues within one year, the company offers free repairs.
3.For instruments used for over a year, the company is responsible for long-term maintenance, with appropriate charges for materials.
4.If the instrument malfunctions, it should be returned to the company for repair. Users are not permitted to disassemble the instrument, as any resulting damage will not be the company's responsibility.

TO KNOW MORE ABOUT Huazheng, PLEASE CONTACT US!
Our experts will solve them in no time.



