- Energy Meter Field Calibrator
-
Transformer Test Equipment
- Transformer Test Bench
- Turns Ratio Tester
- DC Resistance Tester
- Transformer Tan Delta Tester
- Sweep Frequency Response Analyzer
- Partial Discharge Tester
- CT PT Analyzer
- Transformer On-Load Tap-Changer Tester
- Short-Circuit Impedance And No-load Integrated Tester
- Winding Resistance And Turns Ratio Integrated Tester
- Transformer Capacitance And Inductance Tester
- Transformer Capacity And Characteristic Tester
- Lightning Arrester Tester
- Short-Circuit Impedance Tester
- Transformer Oil Test Equipment
- SF6 Gas Analyzer
- Secondary Injection Relay Test Set
- Resistance Tester
- Power Quality Analyzer
- HV Switch Tester
- High Voltage Test Equipment
- Cable Fault Locator
- Battery Tester
Huazheng Manufacture HZSF-15-50 SF6 Gas Recovery Device
|
No. |
Indicator Name and Unit |
HZSF-15-50 |
|
|
1 |
Power Supply AC |
V |
380 |
|
2 |
Rated maximum gas storage pressure(20℃) |
MPa |
≥4 |
|
3 |
Final vacuum |
Pa |
≤10 |
|
4 |
Vacuum maintenance of device |
Pa |
At 133 Pa pressure for 24 hours, the vacuum value increased <400 Pa |
|
5 |
Compressor pumping rate |
m3/h |
Shenyang Valley Wheel 10m3/h Compressor |
|
6 |
Vacuum pump pumping rate |
m3/h |
Shanghai bipolar pump 40 m3/h=15L/S |
|
7 |
Adaptation inlet pressure of the recovery unit(20℃) |
MPa |
0~0.8 |
|
8 |
Recovery final pressure of electrical equipment(20℃) |
MPa |
≤50 Kpa |
|
9 |
Gas oil content control after recovery |
μg/g |
Domestic oil<10 |
|
10 |
Annual leakage rate of the device |
% |
<1 |
|
11 |
Continuous trouble-free running time of the device |
h |
≥1000 |
|
12 |
Accumulated trouble-free running time |
h |
≥5000 |
|
13 |
Noise level |
dB(A) |
The whole machine≤75 |
|
14 |
Actual liquid storage capacity |
KG |
50 |
|
15 |
Refrigerated liquefaction compressor |
|
Domestic Compressor |
|
16 |
Frozen storage tank |
L |
50 |
|
17 |
Gas moisture after recovery(PPM/V) |
PPM/V |
60 |
|
18 |
Gas oil after recovery(PPM/V) |
PPM/V |
60 |
|
19 |
Dry filtration mode |
|
Vacuum heating activation regeneration |
|
20 |
Initial inflation pressure(pa) |
pa |
≤133 |
|
21 |
Inflation final pressure(mpa) |
mpa |
0.8 |
|
22 |
Aeration rate(m³/h) |
m³/h |
≥5 |
|
23 |
Gasification way |
|
Automatic temperature control of electric heating |
|
24 |
Overall dimensions |
Length * width * height |
1360×800×1300 |
|
25 |
Vacuum gauge |
|
Shanghai YunJie |
Operating Instructions
Operating Instructions
Important Instructions
1.Particle Content in Recovered Gas
To protect the compressor from particle pollution and wear, please install a particle filter (with a pore size less than 5 µm) on the inlet pipeline.
2.Mixed Gas Content in Recovered Gas
Do not use this SF6-specific compressor for any other gases. Before using the equipment, remove all gases inside using the vacuum method, reducing the pressure to 0.5 mbar.
3.Power Supply and Wiring
Ensure the correct use of power supply and wiring. If the compressor is used continuously for extended periods or operates under high pressure for long durations, the overheat (overcurrent) protection switch will automatically cut off the compressor’s control power. To restore operation, manual reset is required. Therefore, position the compressor so that the overheating protection switch is easily accessible for manual resetting.
4.Safety and Maintenance
Do not disassemble pressure equipment unless you are a professional. Avoid installing the equipment in locations where it may be struck or damaged. No modifications are allowed.
Note: Only our professional engineers or individuals trained by us are authorized to perform maintenance and repairs.

TO KNOW MORE ABOUT Huazheng, PLEASE CONTACT US!
Our experts will solve them in no time.





