Huazheng HZJB-I Microcomputer 3 Phase Relay Protection Tester
Please Read The Following Instruction Before Operation
1、General Rules For Use
● Industrial control computer and Windows operating system have been set in this tester. Please do not switch on or off the power supply of host too frequently.
● USB interfaces are allocated on the faceplate or backplate, which allow hot-swap USB equipment (such as flash disk, etc), but the drawing or inserting must be done after the data transmission has been completed.
● In order to ensure that the Windows operating system built in the industrial control computer can run steadily, please do not delete or alter the documents in hardware and the logo on the desktop at will. Please do not operate, alter, increase, delete or use the built-in Windows system to avoid any damage on the operating system. When using the USB disk to copy data, please do ensure that the flash disk is clear without virus, and also please do not use the flash disk to set other software programs in this system.
● When connecting outside keyboard or mouse, please do not connect wrong terminal; otherwise the Windows operating system won’t be started up normally.
● Please do not shut off power supply directly during outputting so as to avoid the wrong protection action due to incorrect output.
● When switch quantity is compatible with both idle contact and the potential (0~DC250V) and uses charged contact, the high terminal (anode) of contact potential should be connected with the common end +KM.
● Do not insert objects (e.g.screwdrivers,etc.) into the ventilation slots or any input/output sockets. When taking the tester into operation,make sure that the air slots,the power switch and the power supply plug at the test set remain unobstructed.The instrument should be laid uprightly, or unfold the bracket for slightly tilted placement
● Do not lead external AC/DC power into the voltage and current output sockets of tester.
● If the disturbance is stronger on the spot or high safety is required, before doing the test, please ground the outlet of power source or the protective earth of the tester.
● If the interface data is wrong or you can not input correctly when using this tester, you can settle the problem as follows: delete the ‘para’ file under the ‘E\Relay Protection Calibrator\, and then restart the running program, all data on the interface will be resumed to the default.
2、Procedures Of turning On/Off Tester
Procedures for turning on
● Plug the power line of tester in AC220V outlet. If using external computer, please connect well the serial communication line with computer’s serial interface and the communication interface on the bottom of the tester.
● Checking the wires and ensuring the correct connection, switch on power supply of tester (if you would like to use external keyboard or mouse, please connect them with the tester before switching on the power supply, in this case, the tracking ball is invalid) and the power source of the external computer.A moment later, it will show you the ‘Relay Protection Calibrator’ software interface. On the main interface, click all kinds of functions testing module logo by using the left key of external connected mouse or tracking ball mouse for doing all tests.
● Procedures for turning off
Please do not close down the power switch on the faceplate directly. You should terminate the Windows operating system firstly, and then press the power supply button when indication for safe turning off appears on the screen.
● Move cursor on the main interface through mouse or press the ‘QUIT’ key on the faceplate to quit all functional testing units. After backing to the main interface, press the ‘QUIT’ key again, a dialog window for confirmation will be ejected on the screen. After your confirmation, you can turn off the power supply switch on the front panel when ‘You can turn off the power supply now’ appears on the screen, so the machine can be closed safely.
● You can also turn off the device by choosing the ‘start’ menu of the operation system.
Specification
AC current output | |
Phase current output (effective value) |
0~40A, Output Precision 0.2 degree |
3 phase parallel current output (effective value) |
0~120A |
A Long-time Phase current |
10A |
Maximum output power of Phase current |
450VA |
Maximum output power of 3 parallel current |
900VA |
Maximum Permitted work time of 3 parallel current |
10S |
Frequency range ( fundamental) |
20~1000Hz |
Harmonic time |
2~20 |
DC current output | |
Current output |
0~±10A / phase, 0~±30A / 3 parallel |
Output Precision |
0.5 degree |
AC voltage output | |
Phase voltage output (effective value) |
0~120V Output Precision 0.2 degree |
Line voltage output (effective value) |
0~240V |
Phase voltage / Line phase output power |
80VA / 100VA |
Frequency range (fundamental) |
20~1000Hz |
Harmonic time |
1~20 |
DC voltage output | |
Phase voltage output range |
0~±160V Output Precision 0.5 degree |
Line voltage output range |
0~±320V |
Phase voltage / Line phase output power |
70VA / 140VA |
10 path digital input and 8 path digital output | |
Time measuring range |
0.1ms ~ 9999s ,accuracy of measurement <0.1ms |
Overall, the HZJB-I Three-Phase Relay sets a new standard for protection and control in three-phase power systems, offering unmatched performance, reliability, and flexibility. Whether used in manufacturing facilities, power plants, or commercial buildings, this advanced relay is the ideal choice for ensuring the safe and efficient operation of critical electrical systems.
TO KNOW MORE ABOUT Huazheng, PLEASE CONTACT US!
Our experts will solve them in no time.