- Energy Meter Field Calibrator
-
Transformer Test Equipment
- Transformer Test Bench
- Turns Ratio Tester
- DC Resistance Tester
- Transformer Tan Delta Tester
- Sweep Frequency Response Analyzer
- Partial Discharge Tester
- CT PT Analyzer
- Transformer On-Load Tap-Changer Tester
- Short-Circuit Impedance And No-load Integrated Tester
- Winding Resistance And Turns Ratio Integrated Tester
- Transformer Capacitance And Inductance Tester
- Transformer Capacity And Characteristic Tester
- Lightning Arrester Tester
- Short-Circuit Impedance Tester
- Transformer Oil Test Equipment
- SF6 Gas Analyzer
- Secondary Injection Relay Test Set
- Resistance Tester
- Power Quality Analyzer
- HV Switch Tester
- High Voltage Test Equipment
- Cable Fault Locator
- Battery Tester
0102030405
Huazheng HZ-3110-I Portable Handheld Transformer DC Resistance Tester
I. Main Technical Indicators
To meet the need for fast and reliable DC resistance measurement in transformers, our company has developed a Hand-held DC Resistance Tester. The instrument incorporates advanced power supply technology and offers several key benefits:
Compact design with small size and lightweight construction
High output current and excellent repeatability
Strong anti-interference ability for stable and reliable performance
Perfect protection functions for enhanced safety during operation
II.Technical indicators
|
Test current |
<20mA |
40mA |
200mA |
1A |
3A |
10A |
|
Measuring range |
100Ω-50KΩ |
1Ω-200Ω |
100mΩ-50Ω |
10mΩ-10Ω |
5mΩ-3Ω |
0.5mΩ~0.2Ω |
|
Accuracy |
±(0.5%+2) |
±(0.2%+2) |
||||
|
Minimum resolution |
0.1μΩ |
|||||
|
Operation method |
Touch screen operation |
|||||
|
Dimensions |
Host:252*160*65(mm) Outer box:425*335*210(mm) |
|||||
|
Weight |
Host:2KG Outer box:8KG |
|||||
|
Battery Specifications |
14.8V 5200mAh |
|||||
|
Test lead length |
Standard 5 meters, length can be customized |
|||||
III.Conditions of Use:
Ambient temperature: 0℃-40℃
Ambient humidity: ≤85%RH
Working power: battery powered
Power frequency: (50±1)Hz
Safety and Operational Instructions
1.Inductive Load Measurement
When measuring an inductive load, do not remove the test leads directly to avoid safety risks from inductive discharge. The instrument is equipped with a discharge circuit. After resetting the instrument, the inductor will release energy through the device. Only remove the test leads once the discharge indication is complete.
2.No-Load Voltage-Regulating Transformers
For no-load voltage-regulating transformers, do not switch the tap changer during measurement.
3.Power Supply Interruption
If the power supply is suddenly cut off during the measurement process, the instrument will automatically begin discharging. Do not remove the wiring immediately; wait at least 30 seconds before disconnecting the test leads.
4.Avoid Short-Circuiting Other Windings
During measurement, do not short-circuit or ground untested windings. Doing so may slow down the transformer magnetization process, extend the time for data stabilization, or lead to incorrect readings.
5.Battery Maintenance
If the instrument is not used for extended periods, charge the battery at least once a month to ensure proper functioning.
6.Keep the Test Area Clear
Do not stack unrelated items on or around the equipment panel during testing to avoid interference or potential damage.
7.Avoid Moisture and Oil Pollution
Ensure the instrument is kept dry and free from oil contamination to maintain optimal performance.
8.Current Selection
When selecting the current, refer to the range specified in the technical specifications. If the current exceeds the range, the instrument will remain in a "charging" state because the current cannot reach the preset value. At this point, press the reset button to reset the instrument, select an appropriate current range, or switch to the AUTO mode.
After-sales Service
Instrument from the date of purchase within one year, belong to the company's product quality problems free maintenance, lifelong warranty and technical services. If you find any abnormal situation or malfunction of the instrument, please contact the company in time, so as to arrange the most convenient solution for you, and provide you with the fastest on-site service.


TO KNOW MORE ABOUT Huazheng, PLEASE CONTACT US!
Our experts will solve them in no time.







